Thames Clips
Friday, 10 April 2020
Inspectorate approves Cory’s second London EfW plant
The plant will mean the construction of a second large
EfW
facility on the south bank of the
river Thames
for Cory. It will
be developed alongside
its
existing
facility
which has a capacity of 750,000 tonnes of residual waste per year.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment