Friday, 10 April 2020

Inspectorate approves Cory’s second London EfW plant

The plant will mean the construction of a second large EfW facility on the south bank of the river Thames for Cory. It will be developed alongside its existing facility which has a capacity of 750,000 tonnes of residual waste per year. 

No comments:

Post a Comment